Case Study

Streamlining Product Data Management for Operational Efficiency

Challenge

The client faced the complex task of managing and discontinuing over 800 outdated products. This required coordinating with 80 product owners and handling a backlog of more than 10,000 data entries, posing a substantial challenge to the client’s operational efficiency.

Objective

The objective was to obsolete over 800 products within six months across every enterprise system in the supply chain while ensuring 99% data accuracy and minimizing disruptions.

Industry: Healthcare

Approach

To tackle this challenge, the client outsourced the project to AffinityCore, aiming for a time-saving and cost-effective solution. AffinityCore committed to completing the project within six months and ensured the elimination of human errors while maintaining high-quality standards throughout.

Implementation:

  • null

    Training and Preparation:

    The AffinityCore team conducted knowledge transfer sessions, completing business-specific training within two weeks. This covered data structures, business process workflows, and compliance requirements. A development server was set up for testing, reducing live system errors by 85%.

  • null

    Execution:

    After training, the AffinityCore team assumed the Engineer Author Role in the client’s applications. A meticulous phased approach was deployed:

    • Initial Batches: Small-scale execution with an accuracy rate of 96% in the first two months. 
    • Scaled-up Targets: Weekly cleansing targets increased, achieving a 30% efficiency boost in processing obsolete products. 
    • Closed-Loop Learning System: Continuous adaptation through audits and feedback loops, reducing error rates to less than 1%. 
  • null

    Process Development:

    A structured process ensured 99% data accuracy, with regular bi weekly audits and performance tracking. This optimized the implementation process and reduced rework by 40%.

  • null

    Completion:

    The project was successfully completed six months ahead of the original one-year deadline, demonstrating the success of the collaborative approach and the team’s precision.

Expertise Provided by AffinityCore

Project Management

Data Management

Process Optimization

System Integration

Regulatory Compliance

Results

Product Management:

800+ outdated products were successfully discontinued across all enterprise systems with 99% accuracy.

Cost Savings:

The initiative reduced internal workload by 60%, allowing the client to allocate resources to higher-priority tasks.

Time Savings:

The project was completed in just six months—50% faster than the one-year target.

Collaborative Success:

The structured implementation process and close collaboration ensured a 90% reduction in disruptions, maintaining seamless operations throughout.